Campaign Plan Template
The team’s operating plan for a 3-12 month campaign arc. One document that the team reads at every weekly meeting to know: what the campaign is for, what the next 90 days look like, who owns what, and what we do if a key assumption turns out wrong.
This is the artefact — for the method (what makes a campaign plan good, the canonical arc), see campaign-planning.
Frontmatter (copy verbatim)
---
title: Campaign Plan — <NAME>
status: stub
languages: [EN]
categories: [strategy, organizing]
license: link-only
updated: 2026-MM-DD
campaign_length: <3m | 6m | 12m>
target_audience: <one-line>
---
1. Vision and demand
- The problem we are working on:
- The world we want:
- The specific demand (what we’re asking who to do what by when):
- Why now (the window — what changed in the last 6 months that makes this winnable):
- The campaign’s theory of change (link to theory-of-change one-pager):
2. Power analysis
(Full grid in power-analysis-template; one-line summary here.)
- Base:
- Primary target:
- Secondary targets: <3-5 names + their pressure points>
- Allies:
- Opposition: <active opposition, neutral-tilted, neutral, sympathetic>
- Where our organisation sits (the leverage / vulnerability summary):
3. Audience and message
- Audience 1 (the most reachable base, with their core message and the messenger they trust):
- Audience 2 (the persuadable middle):
- Audience 3 (the silent majority we want to move by proxy):
- Anti-audience (whose narrative we must not strengthen — see framing-and-narrative):
- The story we tell (one paragraph; the public narrative — see public-narrative):
4. Strategy and arc
- Strategic approach (e.g. inside-out / outside-in / both; escalation pattern; phases):
- Phase 1 — Preparation (months 0-3): <what, who, success criteria>
- Phase 2 — Escalation (months 3-9): <what, who, success criteria>
- Phase 3 — Consolidation (months 9-12+): <what, who, success criteria>
- Decision rules (the “if X, then Y” branches — what we do when a key assumption proves wrong):
5. Tactics and timing
- Tactic 1 (use the the-tactic-star (planned) menu) — owner, when, success criteria
- Tactic 2 — owner, when, success criteria
- Tactic 3 — owner, when, success criteria
- Back-pocket tactics (the tactics we’d like to avoid but may need):
6. Resources and budget
- Volunteer headcount needed (per phase):
- Money needed: <total + by quarter>
- Runway:
- Funding plan: <what we’re asking, from whom, by when>
7. Coalition and partnerships
- Coalition partners (organisations, named):
- Coalition decision-making (who decides what):
- Coalition maintenance (the AAR-on-the-coalition cadence — see coalition-building):
8. Measurement and learning
- The three numbers we will not stop watching (the campaign-math dashboard — see campaign-math):
- The leading indicators (early signals that the strategy is working):
- The lagging indicators (the political outcomes we want to move):
- AAR cadence:
9. Risk register
- <risk 1> — probability — impact — mitigation:
- <risk 2> — probability — impact — mitigation:
- <risk 3> — probability — impact — mitigation:
10. Decision rules — the single most useful section
State in advance what the campaign will do if a key assumption proves wrong (the opposition launches early, the funder pulls out, the coalition splits, the target publicly concedes but actually pivots). For each:
- Assumption:
- Signal that it’s false: <what we’d see>
- Then we: <the change we’d make>
Related
- campaign-planning — the method
- theory-of-change — the logic model
- power-analysis-template — full power grid
- action-planning-template — per-event worksheet
- post-action-review-template — what runs after each phase
- campaign-math — the numbers behind the plan
- coalition-building — the partner-management section
- evaluation — the measurement section
